Sunset Fire Hall

Project Type:

Project includes exterior painting, park connectivity (upgrades to parking lot and ADA transitions to the park), restroom and kitchen upgrades.

Project cost to date = $151,383

Required Fire Suppression Sprinklers (unexpected requirement)- Completed 12/7/2021

Interior ADA Upgrades - Delayed 
ADA evaluation revealed the need to re-classify facility and add required Fire Suppression system.

Park Connectivity - Completed 7/18/2020

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

Robinwood Station

Project Type:

This project includes major renovations to convert this facility into a Community Resource Center. Work includes such elements required to meet current building codes and include elements such as accessibility upgrades, seismic upgrades, kitchen upgrades, a new restroom, new kitchen appliances, cabinets and storage and any required on/off-site improvements such as storm water management and paved parking.

Project completed in March 2023

Total Project Cost = $ 1,112,463 

 

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

McLean House

Project Type:

The improvements at the Mclean House include restroom and other upgrades for accessibility, new exterior paint and irrigation upgrades.

Project Cost to date = $37,702

Home Exterior Paining - Completed 4/23/2020

ADA Upgrades- 
Interior entrance, hallway, door and restroom ADA improvements - Completed 6/17/2020
New section of concrete walkway installed that meets ADA requirements - Completed 6/2/2020

Irrigation sustainability and conservation upgrades
 

 

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

Library

Project Type:

Project will include roof improvements, building upgrades and emergency generator.

Project Cost to date = $ 470,357

Entrance area sidewalk repairs - 6/20/2023

Emergency Generator Design and Installation - Completed 8/17/2020

Library Upgrades and Repairs - Completed 2/10/2020

Re-Roofing Improvement Project - Completed 6/2019

 

 

 

 

 

 

 

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

Bolton Fire Hall

Project Type:

Project description and funding allocation will follow future City Council discussion and direction as the future of the building is determined. 

Project Cost to date = $15,803

Assessment Associates Inc. completes Environmental Site Assessment & Asbestos/Lead-Based Paint Survey (hazard materials study) - Completed 6/24/2020

3 Kings contracted to remove and decommission Heating  Oil Tank located onsite and monitoring continues - Completed 1/27/2020

Files:

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

Willamette River Waterfront

Project Type:

The project is envisioned to create a new park area centered on water related activities potentially including paddle craft lessons and rentals, a roped-off river swimming area and natural area and habitat improvements. This project also includes the Willamette Greenway Trail extension of Phase 1 trail from Willamette Park to the Willamette Falls. 

Project Cost to date = $18,818

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

Willamette River Access

Project Type:

This project proposes an improved riverside trail from the Arch Bridge to the catwalk and  potential new decking on the fishing catwalk.  

This project is on hold pending decisions with other major proposed and potential projects in the area by other organizations. 

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

Athletic Field Renovations

Project Type:

Total Project Cost to date = $960,777

Fields Bridge Park - Completed 3/9/2021
In partner ship with West Linn Youth Baseball the artificial turf infields at the Fields Bridge Park baseball fields will be replaced for safety purposes at the end of their useful life.
 

Mary S. Young Park - Completed 8/33/2020
The improvements to the athletic fields at Mary S. Young Park is the  installation of a new drainage system to increase safety and seasonal playability on the natural turf fields.

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

Willamette Park

Project Type:

Improvements at Willamette Park include a new gazebo roof, improved parking along the Tualatin River and an accessible non motorized boat launch area at the mouth of the Tualatin River, and a new boardwalk through the Willamette Park Wetlands.

Accessible  Non-motorized boat launch, parking and Volpp Street improvement project
7/10/2023 -  Contract approved by City Council with KPFF Engineering for Design review, required studies and development of a 30% design for the project.

Boardwalk Project - Completed 6/2022

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

Tanner Creek Park

Project Type:

Tanner Creek Park will become the home of the City’s first outdoor fitness court, along with resurfaced Tennis Court with 4 dedicated pickleball courts.

Project Cost = $118,084 (National Fitness Court also utilized some SDC Funding)

National Fitness Campaign Court- Completed 9/14/2019

Disclaimer

Disclaimer notice regarding project information on this site: While every effort is made to keep project information current and accurate, the City does not guarantee the completeness, reliability, or accuracy of the information and assumes no responsibility for any errors, omissions, or discrepancies.

Pages