Public Works

Synonym: 
publicworks

Dumpster Services

The City of West Linn holds a franchise agreement with Keller Drop Box (dba Republic Services) to provide drop box (dumpster) solid waste management services to the residents and businesses of West Linn. Services must be requested from Keller Drop Box directly at 503-682-3900 or at www.republicservices.com.  Dumpsters shall be placed on private property to the extent there is space available.  No material may be placed in the right-of-way without first obtaining a permit through the WL Police Department.

Tanner Ridge Offsite Improvements

Project Type:

This project includes frontage improvements to the portions of Rosemont Road and Parker Road that front the Tanner Ridge Development. Project includes pedestrian, bike and street improvements including the City's first grade separated cycle track. This project is being coordinated between the City and the developer (ICON Construction).

Status Updates
Files:

Disclaimer

Disclaimer notice regarding the project information on this site: The City of West Linn is pleased to provide as much information as possible on our website for the benefit of the public. This information is updated by staff on a periodic (not daily) basis. However, please be aware of the following: The information on this site is not the official file of record and there may be additional project information in the file of record that is not posted on this site. The information on this site may not include the latest submittals or changes to an application. Interested parties are encouraged to call the City project manager with any inquiries on a project. The official file of record is kept in the City Department managing the project and is available for public review during regular office hours at City Hall located at 22500 Salamo Road, West Linn, Or 97068. Any questions related to any project should be directed to the project manager listed in the file, or by calling City Hall at 503-657-0331.

2018 Slurry Seal

Project Type:

Slurry seal provides a new protective wearing surface to an existing asphalt street.​ By sealing the surface of the street, the base of the road is protected from water damage and the surface is protected from weathering significantly extending the lifespan of the road.

Status Updates
Files:

Disclaimer

Disclaimer notice regarding the project information on this site: The City of West Linn is pleased to provide as much information as possible on our website for the benefit of the public. This information is updated by staff on a periodic (not daily) basis. However, please be aware of the following: The information on this site is not the official file of record and there may be additional project information in the file of record that is not posted on this site. The information on this site may not include the latest submittals or changes to an application. Interested parties are encouraged to call the City project manager with any inquiries on a project. The official file of record is kept in the City Department managing the project and is available for public review during regular office hours at City Hall located at 22500 Salamo Road, West Linn, Or 97068. Any questions related to any project should be directed to the project manager listed in the file, or by calling City Hall at 503-657-0331.

Mary S. Young Park Emergency Culvert Repair

Project Type:

Emergency replacement of existing culvert in Mary S. Young that failed during 2017 storm event. Project included removal of silt, trees, stumps, removal and disposal of existing 18" galvanized culvert, and excavation and installation of new culvert. Project included restoration of park trail washed out during storm event. This project was a joint effort between the City's Public Works and Parks Departments.

Status Updates

Disclaimer

Disclaimer notice regarding the project information on this site: The City of West Linn is pleased to provide as much information as possible on our website for the benefit of the public. This information is updated by staff on a periodic (not daily) basis. However, please be aware of the following: The information on this site is not the official file of record and there may be additional project information in the file of record that is not posted on this site. The information on this site may not include the latest submittals or changes to an application. Interested parties are encouraged to call the City project manager with any inquiries on a project. The official file of record is kept in the City Department managing the project and is available for public review during regular office hours at City Hall located at 22500 Salamo Road, West Linn, Or 97068. Any questions related to any project should be directed to the project manager listed in the file, or by calling City Hall at 503-657-0331.