
The Powerpoint presentation below is the first of three introducing the overall picture of proposed water rate and water SDC fee increases. It starts with a list of identified and necessary water infrastructure projects needed to continue the delivery of high-quality water developed from the City's Water Master Plan.
The portion of these water projects relating to growth and capacity-increasing projects are used in developing the SDC fee increases with the existing system portion of the projects used in developing regular water rate increases.