Water Rates versus Water SDC Fees

The Powerpoint presentation below is the first of three introducing the overall picture of proposed water rate and water SDC fee increases. It starts with a list of identified and necessary water infrastructure projects needed to continue the delivery of high-quality water developed from the City's Water Master Plan. The portion of these water projects relating to growth and capacity-increasing projects are used in developing the SDC fee increases with the existing system portion of the projects used in developing regular water rate increases.